The Building Regulations imply that hangers must be used for joist support but
it is still acceptable to build the joists into the internal leaf of the external cavity wall (though not into party walls) as long as either a sealant is used around the joist end or a proprietary joist cover (sealing box) is provided to prevent air leakage and therefore heat loss. The fact that this precaution is not necessary with a joist hanger is an additional advantage to
using them.
The danger of building joists into the wall is the risk that moisture vapour in a damp cavity may, over a long period, raise the moisture content of the ends of the joists. As the moisture content of the timber settles into equilibrium with the damp air in the cavity, conditions may be created which encourage attack by wood-rotting fungi.
Floor joists should not project across the cavity and touch the external leaf of brickwork or stone work. Even slight projections into the cavity can cause problems as mortar droppings can become attached to the timber and cause bridging of the cavity.



No comments:
Post a Comment