An ASTM subcommittee on pervious concrete, ASTM C09.49, was formed in 2008. ASTM C1688, Standard Test Method for Density and Void Content of Pervious Concrete, has been standardized to measure the density and void content of freshly mixed pervious concrete. Efforts continue to determine the density and void content of hardened pervious concrete for core samples that might be obtained from a pavement. It should be realized that the values obtained on a freshly mixed pervious concrete sample using standardized consolidation procedures can be significantly different from those measured on a pavement core. Various methods are used to place and consolidate pervious concrete in pavements. One should not expect equivalence of the measured densities by ASTM C1688 and that in hardened concrete cylinders or cores.
ASTM C1701 is a standard test method to calculate the infiltration rate of in- place pervious concrete (Figure 1). An infiltration ring is temporarily sealed to the surface of a pervious pavement. After prewetting the test location, a given mass of water is introduced into the ring and the time for the water to infiltrate the pavement is recorded. The infiltration rate is calculated using the equations provided in the standard. Tests performed at the same location across a span of years may be used to detect a reduction of infiltration rate of the pervious concrete, possibly by clogging, thereby identifying the need for remediation. A low infiltration-rate reading on a new pervious concrete pavement suggests paste sealing during construction due to either improper mixture proportions or construction practices. This test should be conducted at several locations and the average infiltration rate calculated.
ACI Committee 522.1 is a pervious concrete specification that requires the following test methods. Job site acceptance must be based on the density (unit weight) of fresh concrete measured according to ASTM C1688. An acceptable tolerance is ±5 lb/ft3 (80 kg/m3) of the design density. This ensures that the concrete that is sup- plied to the job site is the same as the concrete that was ordered for the project. Once the pavement has been constructed, cores are taken and tested for thickness and density. Density is determined according to ASTM C 140. Slump and air content tests are not applicable to pervious concrete. ACI 522.1 also requires that each project include at least three pervious concrete installers or one craftsman which are levels of the pervious concrete contractor certification conducted by the NRMCA.
If the pervious concrete pavement is an element of the storm-water management plan, the designer should ensure that it is functioning properly through visual observation of its drainage characteristics prior to opening of the facility.
Maintenance of pervious concrete pavement consists primarily of prevention of clogging of the void structure. In preparing the site prior to construction, drainage of surrounding landscaping should be designed to prevent ow of materials onto pavement surfaces. The two commonly accepted maintenance methods are pressure washing and power vacuuming. Pressure washing forces the contaminants down through the pavement surface. This is effective, but care should be taken not to use too much pressure because this will damage the pervious concrete. Power vacuum- ing removes contaminants by extracting them from the pavement voids. The most effective scheme, however, is to combine the two techniques and power vacuum after pressure washing.
Subscribe to:
Post Comments (Atom)
Explore Modern And Traditional Construction Methods
A self-build home is the dream of any builder, architect, or even just those with aspirations for their perfect home. They take a lot of blo...
-
Timber stud partitions were an alternative to brickwork and could act as both loadbearing and non . loadbearing walls. If they were supporti...
-
These were very popular in the last quarter of the twentieth century and comprised two layers of plasterboard factory-bonded to a cardboard ...
-
A simple hinge swap provides 2 inches of extra width in a doorway We recently finished a bathroom remodel that included a new curdles sh...